"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi

Capacity

586․17 kW

Location

Kotayk province, v. Nor Geghi

Solar modules

AE SOLAR 390 W, monocrystalline 1503 pcs, Germany

Inverter

5 pieces of Huawei 100 kW inverters

Annual electricity production

879255 kWh

Reduction of CO2 emissions

395 tons / year

Description

 

The installation of  587 kWt power plant was made with 5 inverters. The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.

 

 

"GAVA" LLC, Aragatsotn province, Ashtarak 28.5 kW
"GAVA" LLC, Aragatsotn province, Ashtarak
28.5 kW
Yerevan, Nubarashen 3.06 kW
Yerevan, Nubarashen
23 August 2019
3.06 kW
"Module Sun" LLC, Gegharkunik Province, Mets Masrik village 3500 kW
"Module Sun" LLC, Gegharkunik Province, Mets Masrik village
The installation of the solar station was carried out with bifacial solar panels. 14 Huawei solar inverters with a capacity of 215 kW were used.
3500 kW
"GaGor" LLC, Aragatsotn province, Ashtarak 132.21 kW
"GaGor" LLC, Aragatsotn province, Ashtarak
132.21 kW