School, Syunik province, Agarak

Capacity:

22.44 kW

Location:

Marz Syunik

Solar modules:

AE SOLAR 330 W, monocrystalline 68 pcs, Germany

Inverter:

SMA SUNNY TRIPOWER 20000 TL, Germany

Annual electricity production։

33660 kWh

Type:

On-grid, three-phase

Buzhakan Secondary school after Gegham Gharibyan 51,25 kW
Buzhakan Secondary school after Gegham Gharibyan
51,25 kW
"Sun Energy" LLC, Armavir Province, Merdzavan village 3000 kW
"Sun Energy" LLC, Armavir Province, Merdzavan village
The installation of 3 MW power plant was made with 60 blocks (inverters). The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits. The generated capacity is transferred to the "Spandaryan" substation.
04 Dec 2020
3000 kW
LUSAGHBYUR SECONDARY SCHOOL 20,09 kW
LUSAGHBYUR SECONDARY SCHOOL
20,09 kW
Kotayk province, Abovyan 4.83 kW
Kotayk province, Abovyan
18 Mart 2019
4.83 kW